Pre-work

廠房設備-01
廠房設備-02
廠房設備-03
廠房設備-04
廠房設備-05
廠房設備-06
廠房設備-07
廠房設備-08
廠房設備-09
廠房設備-10
  • 01 Please double check the grain number and confirm with us one week prior to the mold's arrival for the etching process.
  • 02 Please kindly inform us on the steel material to be used for the mold (the cavity and the core), the section of welding and the plastic material.
  • 03 Please kindly inform us on the area to be etched and on the grain direction and draft.
  • 04 Indicate delivery time.
  • 05 Including the final finished piece, KD piece and associated information.
  • 06 Please inform us if the molds have had heat treatment, the surface is complete and its smoothness.